Organisation de la cérémonie · Critical infrastructure

Infrastructure de l’événement : électricité, groupe électrogène, connexion et climatisation testés avant l’ouverture des portes

An event can have the right tickets, crew and suppliers and still fail because the power went out, ticket validation lost internet or the generator ran out of fuel. Here every event has a power map with load per circuit, calculated generator runtime, internet with a backup link at critical points, lighting and climate control mapped, agreed redundancy, a live monitor, the checklist that clears opening and the infrastructure handover agreement.

O problema e a saída

As dores que Critical infrastructure resolve todos os dias

Se alguma dessas situações parece familiar, é porque elas se repetem em quase toda empresa de formatura, até o sistema certo entrar em cena.

A dor

The bar's breaker tripped when the draft beer taps and the freezer were turned on together.

Com o Partiu Formatura

Each power point has a capacity and connected equipment, and the combined load raises a warning before it goes over the limit.

A dor

The generator was sized by guesswork and the diesel ran out before the party ended.

Com o Partiu Formatura

Output, consumption and on-site fuel calculate runtime against the event duration with a safety margin.

A dor

Ticket validation stopped because there was only one internet link.

Com o Partiu Formatura

Validation, box office, POS and streaming are critical points. A critical point without a backup link shows up as critical on the monitor.

A dor

Nobody checked the air conditioning and the hall got stuffy with 900 people.

Com o Partiu Formatura

Climate control records capacity and maintenance, and the requirement is estimated from the area and expected attendance.

A dor

The gates opened with the sound still untested.

Com o Partiu Formatura

The technical opening checklist covers power, internet, sound, lighting, video, gates and communications, and only clears once critical items are checked.

A dor

The power outage turned into an argument over who would pay for the damage.

Com o Partiu Formatura

The failure log records time, impact, solution, cost and who bears the cost, and the handover agreement shows what the venue delivered tested.

Na prática

Exemplos reais de como Critical infrastructure trabalha por você

Situações do dia a dia de empresas de formatura, do problema ao resultado, usando os módulos que você vê nesta página.

01

Load redistributed during setup

O cenário

The caterer brought two electric ovens that weren't in the plan.

Com o sistema

Production added the ovens to the kitchen power point and the load went over 100% of capacity.

O resultado

One of the ovens was moved to another circuit during setup, with no breaker trips during dinner.

02

Diesel calculated, not estimated

O cenário

The ball ran from 10 p.m. to 5 a.m. with the generator as the main power source.

Com o sistema

Runtime calculated from the on-site fuel came to six hours against the nine required by the margin.

O resultado

Extra refueling was arranged with the supplier the day before.

03

Opening cleared with numbers

O cenário

The coordination team wanted to open the gates at 9:30 p.m.

Com o sistema

The checklist showed the box office backup link without a failover test, a critical item.

O resultado

The test took ten minutes and opening was cleared with a record of who checked it.

Como funciona

O caminho que a informação faz em Critical infrastructure

Cada etapa é um módulo de verdade, e o que sai de uma entra na outra sem ninguém digitar de novo.

  1. 1MapPower, generator, internet, lighting and climate control are registered per event.
  2. 2SizeLoad, runtime and climate requirements are calculated.
  3. 3TestEach critical resource gets a test and redundancy.
  4. 4Tout décocherThe opening checklist clears the gates once critical items are checked.
  5. 5MonitorThe monitor follows the night and failures are logged.
  6. 6FormalizeThe handover agreement records what the venue and supplier delivered.

Módulo por módulo

Tudo o que existe em Critical infrastructure

5 módulos e 20 recursos nesta página, o mesmo cadastro de turma, formando e evento sustentando todos eles.

Power and Generator

Where the power is, what's plugged in and how long the generator will last.

  • Points with voltage, phases, breaker and capacity
  • Connected equipment, including Technical Production gear
  • Generator with output, consumption and on-site fuel
  • Runtime calculated against the event duration

Internet

Primary link, backup and the points that can't go down.

  • Links with contracted and measured speed
  • Network points by use: validation, box office, POS, streaming
  • Critical points without backup flagged
  • Failover test to the backup link recorded

Lighting and Climate Control

The environment the audience feels.

  • Fixtures by area with circuit, operator, scene and DMX
  • Lighting power added to the point's load
  • Climate control with capacity, supplier and maintenance
  • Requirement estimated from area and attendance

Redundancy and Monitor

Plan B for each resource and the live status.

  • Backup, location, operator and replacement time
  • Battery, fuel, temperature and speed readings
  • Full-screen monitor with alerts by level
  • Technical Production readiness on the same dashboard

Opening, Failures and Agreement

Clearance, what went wrong and what was delivered.

  • Opening checklist with critical items and evidence
  • Conditional clearance only with a reason and permission
  • Failures with impact, cost and a mirror in the Operations Room
  • Handover agreement accepted via link by the venue or supplier

Encontre o plano ideal para Critical infrastructure

Compare os módulos e escolha a configuração que acompanha sua operação.