Référence complète du module

Planifier, produire et chiffrer chaque article sans perdre de matière ni de délai

From the leadership's aggregate plan to the operator's shop floor report, on the same inventory and procurement base: S&OP by family, demand forecasting, MRP with a calendar and real lead times, a master schedule validated against capacity, detailed load by work center, leveling with the cost on the table, distribution across locations, delivery date promises for sales, and shop floor feedback correcting the plan. Invitations, kits, giveaways, albums, gowns and any item the company makes start from real demand and end with a lot, actual cost and full traceability.

Parcourez les 27 écrans d’administration, les 14 domaines fonctionnels, chaque fonctionnalité répertoriée, les décisions de conception, les intégrations, les droits, la séquence des livraisons et le glossaire de la production.

  • 27écrans dans le panneau d’administration, du cockpit de direction au terminal de l’opérateur
  • 14domaines fonctionnels, de l’ingénierie produit au coût réel
  • 257fonctionnalités répertoriées, une à une, sur cette même page
  • 13livraisons successives, chacune utile par elle-même avant la suivante

Dans le module

27 screens, in the order the work happens

Quatre blocs suivent le travail : l’ingénierie définit le produit, la planification décide quoi produire et quand, l’atelier consigne ce qui s’est passé, et le tableau de bord affiche le résultat.

01

Ingénierie

Les données de référence qui décrivent ce que l’entreprise fabrique et avec quoi. Tout est versionné : une fiche validée ne se modifie jamais, on en crée une nouvelle version.

5 screens
  • Nomenclature produitLa nomenclature multiniveau, avec quantité de base, rebut par composant, articles de substitution, options, coproduits, dates d’effet et la question « où cet article est-il utilisé ».
  • Gammes de fabricationLa séquence des opérations avec réglage, temps unitaire, lot de transfert, sous-traitance, point de contrôle et instructions de travail jointes.
  • Postes de chargeCombien de ressources, combien d’heures, quel rendement et quel coût horaire. C’est de là que vient la capacité utilisée par le plan.
  • Ressources et compétencesMachine, personne, outil, moule et montage, chacun avec son calendrier et son coût, une matrice de compétences par personne et une durée de vie d’outillage suivie en cycles.
  • CalendriersCalendriers usine, achats, transport et fournisseurs, avec import des jours fériés par année et simulation des délais avant toute prise d’effet.
02

Planification

Du volume validé par la direction pour chaque famille jusqu’à la proposition d’ordre avec date et quantité, en passant par la matière et la capacité.

14 screens
  • Demande et politiquesD’un côté commande client, événement, promotion, projet, contrat ou saisie manuelle ; de l’autre lot minimum, multiple, maximum, stock de sécurité et règle de lotissement.
  • Délais et réservationsDélai décomposé en traitement, transport, contrôle et sécurité, avec des paliers de quantité, et réservations fermes distinguées des réservations souples.
  • Réseau et distribution (DRP)Sites, itinéraires avec temps de transit, règles d’approvisionnement par article et regroupement des expéditions, pour les entreprises disposant de plusieurs entrepôts ou magasins.
  • Prévision de la demandeHuit modèles statistiques appliqués à un historique figé, erreur mesurée en MAPE et en biais, et consommation de la prévision par les commandes fermes.
  • Calcul des besoins (MRP)Le lancement du calcul et son résultat : besoin net par article et par date, chaque étape du calcul étant conservée et la traçabilité rédigée en clair.
  • Messages d’actionAvancer, différer, augmenter, réduire, annuler, et les ordres déjà en retard à leur création, avec une tolérance paramétrable pour éviter le bruit.
  • Excédents et obsolètesLe versant que le MRP classique ignore : surplus, excédents et articles dormants, avec la valeur immobilisée et le suivi consigné.
  • S&OPLa grille famille par mois avec demande non contrainte, plan de vente, plan de production, stock projeté et carnet de commandes, dans un cycle versionné.
  • Programme directeurLa grille produit par période avec une seule colonne modifiable, un horizon ferme conservé période par période et un scénario promu en version officielle.
  • RCCP et profilsValidation du plan trimestriel au regard des ressources critiques, à partir de profils de charge avec décalages, sans éclater la moindre nomenclature.
  • CapacitéCapacité par poste et par jour, arrêts déjà déduits et équipes supplémentaires ajoutées, les surcharges étant signalées avant de devenir des retards.
  • CRP et goulotsCharge détaillée par ordre et par opération, trois capacités côte à côte (théorique, effective et démontrée) et la file des goulots à venir.
  • Lissage (APS)Neuf stratégies testées par ordre de coût, chaque proposition indiquant la valeur, les heures déplacées et qui rate une date. Rien ne s’applique tout seul.
  • Gantt de productionLe planning par poste, avec les opérations en retard mises en évidence et toute barre déplacée verrouillée, afin que le calcul suivant compose avec elle.
03

Atelier (MES)

L’ordre avec son ingénierie figée, le terminal que les opérateurs utilisent réellement et les retours qui corrigent le plan.

5 screens
  • Ordres de fabricationLancement avec contrôle de la matière, nomenclature et gamme recopiées dans l’ordre, et composants et opérations en prévu contre réalisé.
  • Déclarations de productionRéglage, démarrage, production, pause, reprise, rebut, retouche et clôture, avec un identifiant idempotent pour que la file hors connexion ne compte jamais deux fois.
  • Date promiseLa réponse pour les commerciaux : la date et sa justification. Elle dispose de son propre droit d’accès et n’exige pas d’accès aux coûts ni aux déclarations de production.
  • Respect du planDate, quantité, séquence et promesse tenue, en distinguant un plan irréalisable d’une mauvaise exécution, car la responsabilité n’est pas la même.
  • Coûts de productionMatière, main-d’œuvre, machine, sous-traitance et frais généraux, prévu contre réalisé, en séparant l’écart sur prix de l’écart sur quantité.
04

Tableau de bord et paramètres

La vue pour celui qui répond du résultat, et les paramètres pour celui qui répond du module.

3 screens
  • Tableau de bordNomenclatures validées, articles fabriqués sans nomenclature, propositions en attente et alertes critiques du dernier calcul.
  • CockpitRespect du plan, promesses tenues, taux d’utilisation, temps d’inactivité, rebuts, en-cours et ordres en retard, chaque indicateur indiquant l’écran dont il provient.
  • ParamètresActivation du module, plus de quarante paramètres de planification avec la valeur système affichée en regard, et l’historique de qui a activé quoi.

Le problème et la réponse

Ce qui change pour les équipes de planification et de production

Le point de douleur

Production starts from an outdated materials spreadsheet, and the shortage shows up when the order is already late.

Avec Partiu Formatura

Versioned, released multilevel structures feed the MRP, which deducts inventory, reservations, purchases in transit and open orders before suggesting what to buy or make.

Le point de douleur

Sales promises a date without knowing whether the print shop, the bindery or the in-house team has the capacity to deliver.

Avec Partiu Formatura

The master schedule and finite capacity calculate utilization by work center, shift, downtime and efficiency, with overloads highlighted before a promise turns into a delay.

Le point de douleur

A change to the product spec silently alters an order that was already on the shop floor.

Avec Partiu Formatura

When an order is released, its structure and routing are copied and frozen with their versions. New engineering applies to future orders, without rewriting the past.

Le point de douleur

Materials picked, consumed, returned and scrapped become a single unexplained inventory adjustment.

Avec Partiu Formatura

Each step has its own movement, operator, quantity and reason; the finished lot keeps the genealogy of its inputs, and every correction happens through a traceable reversal.

Le point de douleur

The cost of the album or kit is estimated before production and never compared with what actually happened.

Avec Partiu Formatura

Closing the order compares planned and actual by material, labor, machine, subcontractor and overhead, separating price, quantity and capacity variances.

Le point de douleur

The operator reports on paper or on a complicated screen at the end of the shift, when the information has already lost accuracy.

Avec Partiu Formatura

A direct terminal records setup, start, output, pause, resume, scrap and completion; the offline queue can be resent without duplicating quantities.

Le point de douleur

Lead time is counted in calendar days, and the order is created with a start date on a holiday, a Sunday or a day the supplier doesn't deliver.

Avec Partiu Formatura

Separate calendars for the plant, procurement, transportation and suppliers count lead time in real business days, with holidays imported by year. Lead time stops being a loose number and becomes the sum of processing, transit, inspection and safety time, with ranges by quantity.

Le point de douleur

The week doesn't fit, and the only known fix is to authorize overtime, without anyone knowing whether a cheaper alternative existed.

Avec Partiu Formatura

Leveling tests nine alternatives in order, from cheapest to most expensive, and presents each one with cost, hours moved and impact in days. Pulling work forward comes before overtime, and accepting the delay comes only at the end, with the list of who misses the deadline.

Le point de douleur

The planner looks at a utilization number and can't explain to production where it came from.

Avec Partiu Formatura

Load is stored by order and by operation: the histogram bar opens to show which orders make it up, how much is setup, how much is run time and how much is already firm.

Le point de douleur

The sales forecast is a yearly guess nobody reviews, and purchasing doubles up when the firm order arrives in the same month.

Avec Partiu Formatura

Eight statistical models calculate the forecast from frozen history, with error measured as MAPE and bias, and firm orders consume the forecast within a configurable window instead of adding to it.

Le point de douleur

A change of color, mold or thickness eats half a shift in cleanup, and nobody organizes the queue with that in mind.

Avec Partiu Formatura

The setup matrix knows that going from white to black costs differently than going from black to white, and campaigns group what can be grouped within a window that doesn't push back what is due sooner.

Le point de douleur

The salesperson promises a date on gut feeling, and the plant finds out about the commitment when the customer complains.

Avec Partiu Formatura

The promise screen answers with a date and a reason: available stock covers it, or production takes this long because the paper arrives on one day and printing only has room on another. An accepted promise becomes firm demand in the same step, and planning knows about the commitment.

Le point de douleur

Leadership discusses volume in a monthly meeting and the plant plans item by item, and the two numbers never meet.

Avec Partiu Formatura

S&OP works by family and by month, with unconstrained demand, the sales plan and the production plan on the right lines. Once approved, it becomes a limit on the master schedule and is disaggregated into item forecasts based on each item's history.

Le point de douleur

The company has a store and a warehouse besides the plant, and transfers between them are arranged by phone.

Avec Partiu Formatura

The supply network defines where each item comes from at each location, with percentages and effective dates. DRP runs before MRP and passes demand back to the source already at the shipping date, with transit time deducted and freight consolidated.

Le point de douleur

Everyone knows the plant runs late, and nobody can prove whether the problem is the plan or the execution.

Avec Partiu Formatura

Adherence measures the two separately: an order that ran late with a feasible plan is execution; an order that ran late with overload already visible at release is planning. The cockpit shows both side by side.

Le point de douleur

Standard cost is updated along with actual cost, and the variance always comes out close to zero.

Avec Partiu Formatura

Standard cost is frozen by version with an effective date. The previous version is closed and preserved, because it is what explains the price set last year.

Comment ça marche

De la demande et des matières au coût de production réel

  1. 1

    S&OP decides volume

    The monthly meeting settles, by family, how much the company commits to sell and produce. Once approved, the plan becomes a limit on the master schedule and is disaggregated into item forecasts.

  2. 2

    Demand comes in

    An order, event, class, project, forecast or manual entry provides product, quantity and need-by date. A firm order consumes the period's forecast instead of adding to it.

  3. 3

    MRP calculates

    The structure is exploded and net requirements account for balances, reservations, transit, safety stock and scheduled supply. Lead time is offset on the real calendar, broken down into processing, transit and inspection.

  4. 4

    The plan validates

    The master schedule checks requirements against capacity, shifts, downtime and bottlenecks at each work center.

  5. 5

    Load opens up

    CRP shows utilization by work center and by day, with each bar opening into the orders behind it and the capacity the plant actually demonstrated in shop floor reports.

  6. 6

    Capacity levels out

    Where it doesn't fit, the system proposes alternatives in order of cost, from cheapest to most expensive, and waits for your decision before changing any date.

  7. 7

    Orders are released

    Structure and routing are frozen, materials are checked, and execution gets priorities and dates.

  8. 8

    The plant reports

    Operators record output, consumption, downtime, scrap, rework and subcontracting as they happen.

  9. 9

    Cost closes

    The finished product enters inventory with the order's lot and cost, and the dashboard explains each variance against standard.

  10. 10

    The plan learns

    Adherence measures what was delivered on the day and the real time of each operation. Persistent deviation becomes a suggestion to review the standard, and a confirmed delay replans whatever depends on it.

Comment le système se comporte

6 decisions that explain everything else

Elles expliquent pourquoi le système ne fait parfois pas ce que vous attendez, et pourquoi c’est voulu.

Le système propose, vous décidez

Le lissage, la révision des temps standards et les suggestions de plan sont enregistrés comme des propositions. Rien ne modifie une date d’ordre, n’ouvre d’heures supplémentaires ni n’envoie du travail en sous-traitance avant qu’une personne ne l’applique, et au-delà du seuil fixé par l’entreprise l’action sort de l’application en masse.

Validé signifie verrouillé

Nomenclature, gamme, cycle S&OP, profil de charge et coût standard sont figés par version. Réviser, c’est créer la version suivante ; la précédente continue d’expliquer ce qui a été produit et comment le prix a été construit.

Pas de donnée, pas de chiffre

Le rendement des équipements, le coût du retard et le respect du plan restent vides lorsque les données manquent. Un seul chiffre inventé ruine la confiance dans tout le tableau de bord.

Le calcul est conservé

Chaque besoin conserve la quantité nécessaire, le stock disponible, ce qui était en transit, ce que le stock de sécurité a retenu, le rebut appliqué, la règle d’arrondi et l’origine de chaque jour de délai. La charge se détaille ordre par ordre.

Tout démarre désactivé

Le module ne répond pas tant qu’il n’est pas activé, et en son sein calendriers, prévision, lissage, réseau de distribution et promesse de date s’activent un à un. Chaque activation est une décision consignée, avec son auteur et sa date.

Les corrections sont des contre-passations

Une déclaration de production ne se supprime jamais. Une correction est une écriture inverse qui conserve la trace de l’erreur, et le renvoi de la file hors connexion n’ajoute jamais deux fois la même production.

Les limites

Comment la planification de production se relie au reste de la plateforme

Le module ne conserve jamais de seconde copie. Il lit ce qui existe déjà et restitue ce qu’il a produit par le même chemin que le reste de la plateforme.

Achats et approvisionnement

La proposition d’achat du MRP devient une demande d’achat dans le circuit existant, à l’état de brouillon et soumise aux mêmes seuils de validation. La commande émise revient dans le calcul comme matière en transit, avec sa date d’arrivée prévue.

Stocks et WMS

Les soldes de stock n’ont qu’un seul responsable. Avec l’entrepôt adressé activé, chaque sortie de composant et chaque entrée de produit fini passe par le WMS ; sans lui, les mouvements alimentent le stock simple par le même chemin que le reste de la plateforme. Le PCP n’écrit jamais un solde directement.

Qualité

Le temps de contrôle constitue une composante à part du délai, et la matière en contrôle ou en quarantaine n’entre dans le calcul que si l’entreprise le décide.

CRM et ventes

Les dates promises disposent de leur propre droit d’accès : le commercial obtient la date et sa justification sans voir les coûts ni les déclarations de production. Une promesse acceptée devient une demande ferme dans le même geste.

Coûts et comptabilité

Les produits finis entrent en stock au coût réel de leur propre ordre, ventilé par élément, et l’écart au coût standard s’explique en écarts de prix, de quantité, de capacité, de composition et d’inactivité.

Établissements et multisite

Le réseau d’approvisionnement se situe au-dessus de l’établissement : un établissement peut compter deux entrepôts, et seul le site déclaré comme usine produit.

Gouvernance

Qui voit quoi, et ce qui s’exécute sans que personne le demande

7 separate permissions

Chaque droit n’ouvre que les informations et les actions dont le rôle a besoin.

  • ViewOpens the screens and reads plan, load, requirements and trail. Changes nothing.
  • EngineeringStructure, routing, work center, resource, skill and calendar.
  • PlanMRP run, master plan, forecast, leveling, lead time, reservations and distribution network.
  • ReleaseTurns suggestions into orders and releases orders to the shop floor.
  • ReportProduction terminal. Only what the operator needs, with no plan and no cost.
  • CostsOrder cost, standard cost, variances and the financial side of the indicators.
  • SettingsActivates the module and is accountable for the planning parameters.

Traitements exécutés automatiquement

Chaque exécution consigne son résultat, sa durée et les informations utilisées.

  • Nightly MRPThe full overnight run, which replaces the previous run's propositions au lieu d’accumuler des achats en double.
  • Replanification incrémentaleToutes les 15 minutes, uniquement sur ce qui a changé, pour que le plan du jour n’attende pas la nuit. Facultative et désactivée par défaut.
  • Charge de capacitéRecalculée après le MRP, afin que la charge tienne compte des ordres qui viennent d’être créés.
  • PrévisionHebdomadaire, pas quotidienne : une prévision mensuelle refaite chaque jour produit de nouveaux chiffres sans nouvelle information.
  • Respect du planClôture la journée en comparant le prévu au réalisé, en distinguant la planification de l’exécution.
  • IndicateursConsolide le cockpit de la période, en laissant vide ce qui n’a pas de données.
  • Clôture des coûtsClôture les ordres terminés et restitue le coût réel par élément.

Séquence des livraisons

Chaque livraison apporte une capacité utile

1. Ingénierie produit

Unités et conversions, postes de charge avec équipes, gammes et nomenclatures versionnées avec validation, obsolescence et coût standard.

2. MRP

Politiques par article, demande, prévisions, lancement du calcul, besoins nets remontés jusqu’à la demande d’origine, ordres planifiés et messages d’action.

3. Capacité

Programme directeur avec scénarios et gel, arrêts par poste, capacité par période et ordonnancement à capacité finie.

4. Atelier

Ordres de fabrication avec ingénierie figée, composants, opérations, motifs d’arrêt, déclarations de production, coût de l’ordre, généalogie des lots et sous-traitance.

5. Données de référence avancées

Calendriers avec jours fériés, délai composite, réservations, ressources au-delà du poste de charge, compétences par personne et exigences de compétence sur les opérations.

6. Demande

Familles de planification, historique figé, les huit modèles de prévision et la consommation de la prévision par les commandes fermes, avec la trace de la commande qui a consommé quelle prévision.

7. MRP avancé

La traçabilité du calcul rédigée en clair, la replanification incrémentale déclenchée par événement et la liste des excédents, surplus et stocks obsolètes.

8. Réseau et distribution

Sites au-dessus de l’établissement, itinéraires avec temps de transit et coût, règles d’approvisionnement avec répartition et dates d’effet, et transferts planifiés en expéditions regroupées.

9. S&OP et RCCP

Un cycle mensuel versionné avec étapes brouillon, consensus et validé, des profils de charge avec décalages et la validation du plan au regard des ressources critiques.

10. CRP

Charge par ordre et par opération, capacité démontrée par les déclarations de production, goulots mesurés sur la charge réelle et alertes sur les paramètres périmés.

11. APS

Matrice de réglages dépendants de la séquence, campagnes par attribut, les neuf stratégies de lissage avec coûts et seuils de validation, et le plan publié en version figée.

12. Boucle fermée

Disponible à la vente jour par jour, date réalisable simulée avec la contrainte qui l’a limitée, respect du plan sur quatre dimensions et temps réel par opération.

13. Indicateurs

Coût standard figé par version avec dates d’effet, coût du plan montrant les deux côtés du calcul et un cockpit qui n’invente jamais un chiffre en l’absence de données.

En pratique

5 everyday situations, from problem to result

01

Graduation kits planned from events

Le scénario

The company assembled kits for dozens of classes and bought packaging, giveaways and printed materials based on a feel for consumption, swinging between excess and stockouts.

Avec le système

Each event generated demand for the finished product. MRP exploded the kit structure, deducted balances and reservations, and turned requirements into purchase requisitions and production orders.

Le résultat

Procurement got justified quantities and need-by dates, production saw the upcoming load, and the kits were ready before event picking.

02

A binding bottleneck spotted before the delay

Le scénario

The lab kept accepting new albums because there was material, but binding was already committed to the week's orders.

Avec le système

Finite capacity scheduling took shifts, efficiency, setup and downtime into account, and the Gantt chart highlighted the overload at the bottleneck work center.

Le résultat

Part of the load was pulled forward and part was outsourced before it affected delivery, keeping the date promised to the graduates.

03

A full week solved without overtime

Le scénario

The week of peak invitation volume overran printing capacity by twelve hours, and the usual fix was to authorize overtime on Friday.

Avec le système

Leveling tested the alternatives in order: six hours fit into the two previous days, one hour fit into the slack the delivery still allowed, and four hours went to the secondary machine, which takes longer per piece and so showed up with its own cost.

Le résultat

Less than an hour of overtime was left, approved with one click and with the estimated cost on screen. The decision stayed with the planner, but with the three cheapest alternatives already tested.

04

The promised date stopped being a guess

Le scénario

Sales promised lead times based on history, and the plant only found out about the commitment when the order hit the queue already late.

Avec le système

The promise check started by looking at planned available stock and, when that didn't cover it, simulating materials and capacity. The answer came with the date and the constraint: the input arriving late or the work center with no slack.

Le résultat

The salesperson started negotiating with the customer knowing what was holding things up, and the accepted promise became firm demand in the plan the moment it was made.

05

Actual cost explained the lost margin

Le scénario

One album model sold well, but the planned margin never showed up in the results.

Avec le système

Closing the orders separated the paper price variance, consumption above the structure, extra machine hours and rework by reason.

Le résultat

The company corrected the planned scrap in the structure, adjusted the routing and carried the actual cost into setting the new price.

Glossaire

Le vocabulaire de la production en clair

Le panneau d’administration utilise des libellés en portugais. Voici les termes équivalents employés en production et en planification.

BOMNomenclature (Bill of Materials)
La structure du produit : ce qui entre dans chaque unité, sur autant de niveaux que nécessaire.
MRPCalcul des besoins nets (Material Requirements Planning)
Le calcul qui transforme la demande en ce qu’il faut acheter, produire et pour quand.
MPSProgramme directeur de production (Master Production Schedule)
Le programme directeur : combien produire de chaque article par période, validé au regard de la capacité.
S&OPPlanification des ventes et des opérations (Sales and Operations Planning)
Le plan agrégé par famille et par mois, qui devient la limite du programme directeur une fois validé.
RCCPValidation globale de la capacité (Rough Cut Capacity Planning)
La validation de haut niveau du plan au regard des ressources critiques, sans éclater la nomenclature.
CRPCalcul détaillé des charges (Capacity Requirements Planning)
La charge détaillée par poste, ordre et opération, face à la capacité réelle.
APSPlanification et ordonnancement avancés (Advanced Planning and Scheduling)
Ordonnancement et lissage à capacité finie, avec réglages dépendants et règles de priorité.
DRPCalcul des besoins de distribution (Distribution Requirements Planning)
La planification entre sites, qui s’exécute avant le MRP et restitue la demande à la date d’expédition.
ATP / CTPDisponible / réalisable à la promesse (Available / Capable to Promise)
Ce qui est disponible à la vente et, lorsque cela ne suffit pas, la date réalisable simulée en tenant compte de la matière et de la capacité.
TRSTaux de rendement synthétique (Overall Equipment Effectiveness)
Disponibilité, performance et qualité du poste de charge, réunies en un seul indice.
En-coursEn-cours de production (Work in Process)
La matière déjà sortie du stock et pas encore devenue produit fini.
MESSystème d’exécution de la production (Manufacturing Execution System)
La couche atelier : ordres lancés, déclarations de production, arrêts, rebuts et traçabilité.

Planifiez et produisez à partir des informations que votre activité utilise déjà

Parlez à notre équipe de vos produits, de votre capacité et de votre séquence de déploiement.